fbpx

CITY OF BREA

Home to 39,282 people, as of the 2010 census, the city of Brea is located in the Orange County. Crude oil production was the main source of income here in the early days which later changes to the citrus production. Brea is now considered an important retail center in California. The city was incorporated in 1917.

Brea’s Community Development Department holds the power to approve or reject your structural plans. Thus, if you want to build a new structure or renovate an older one, residential or commercial, getting prior approval of the city’s Planning Department is mandatory. The process of getting an approval requires thorough paperwork and having a civil or structural engineer in Brea by your side increases your chances of getting the permit. The community development department can be contacted at 1 Civic Center Circle, Brea, CA 92821. You can also call them at 714-990-7689 for information.

If you need guidance or help with the approval process, you can get in touch with the experts at the Eden Group. We have engineers who have years of experience working with clients helping them get approvals from the planning and development authorities. We have helped them get approval of projects such as drainage plans, grading plans, street improvement plans, structural plans and hydrology plans and also helped in their construction. With the skills and expertise needed for the job, our experts will take care of all the paperwork and will meet with the officials to get a permit for your developmental needs. Get in touch with us today to discuss the prospects so we can get started with the process right away.

 

 

Building in the City of Brea :

The planning process for building in Brea typically involves several steps, including the following:

  1. Research Zoning Requirements: Understanding the requirements of any construction project is essential. Zoning regulations specify how the land can be used and developed in Brea, and they can vary depending on the property’s location and characteristics. Therefore, it’s crucial to research the zoning requirements for the specific property to ensure that the intended use of the property is allowed.
  2. Obtain Permits: Once the project’s scope and design have been established, the next step is to obtain the necessary permits from the City of Brea. Building permits are essential and are required before any construction can begin. Depending on the type of construction, other permits may also be necessary, such as electrical, plumbing, or mechanical permits.
  3. Hire a Design Professional: It is usually necessary to hire a licensed design professional, such as an architect or engineer, to create plans that meet building codes and zoning requirements and withstand the environmental factors in Brea. These professionals are experienced in understanding the city’s requirements and can develop plans that will meet the necessary regulations.
  4. Site Analysis: A site analysis is a critical step in the planning process. The analysis helps identify the property’s specific conditions, including soil quality, drainage patterns, topography, and any natural features or hazards that could impact the construction. The information collected during this step will influence the design and construction methods used for the project.
  5. Design Development: Based on the site analysis and zoning requirements, the design professional can create a design that meets the project’s and the site’s needs. The design will include detailed drawings, specifications, and any other necessary documentation required by the City of Brea.
  6. Permit Review: Once the design plans and other necessary documents are submitted to the City of Brea, the City will review the plans to ensure they meet local building codes and zoning requirements. The review process may take several weeks, and the City may request revisions or additional information.
  7. Approval: Once the plans are reviewed and approved, the City issues the necessary permits for construction. Ensuring all permits are obtained before starting the construction process is essential.
  8. Construction: During the construction process, inspections are conducted to ensure that the work complies with the approved plans. The construction team should be familiar with Brea’s building codes, regulations, and inspection processes.
  9. Final Inspection: After the construction is complete, a final inspection is conducted to ensure that the building meets all requirements and is safe for occupancy. It’s essential to obtain a Certificate of Occupancy from the City of Brea before using the building.

In summary, the planning process for building in Brea can be complex and time-consuming. Therefore, it’s essential to work with experienced professionals, follow the City’s requirements, and allow sufficient time for the permit and inspection processes.

 

City of Brea – Planning Department:

The Planning Division of Brea is a crucial component of the Community Development Department. Their primary role is to ensure that structures and amenities related to the built environment in Brea are well-functioning and of high quality, which ultimately supports the life and business of the city. The Planning Division comprises a dedicated team of professionals who work alongside property owners and developers to craft projects that adhere to high standards and meet the city’s requirements.

One of the key functions of the Planning Division is to ensure that proposed new construction or modifications to the property are compatible with the existing uses in the surrounding neighborhood. To achieve this, the planners work with neighboring property owners in the early stages of the project to minimize the impact of the construction or modifications. This coordinated approach helps foster a sense of community and enhances Brea’s overall quality of life.

The Planning Division is guided by various legal guidelines established by state and federal authorities, as well as the City of Brea General Plan. This plan outlines the long-term vision for the city, including land use, transportation, and environmental sustainability. The planners work closely with the City Council-appointed Planning Commission, a five-member body responsible for citizen oversight and approval of proposed projects. Public hearings are often conducted as part of the process for large-scale projects, ensuring that the community can provide feedback and influence the project’s outcome.

 

City of Brea – Building and Safety Department:

The Building & Safety Division in Brea has a mission to safeguard the lives and well-being of residents and visitors in the city, as well as to maintain the quality of life and contribute to economic development. This is achieved by enforcing the building, plumbing, mechanical, electrical, and energy codes and regulating local and state laws for all buildings within the city.

The Division is crucial in ensuring a safe, accessible, and energy-efficient environment in the community. They offer plan reviews and field inspections of buildings to ensure compliance with safety regulations, and they also regulate laws related to building construction, maintenance, use, repair, and rehabilitation.

In addition, the Division manages the City’s permit system, which streamlines the construction permit process. When customers apply for construction projects, the Building & Safety Division coordinates the review process with several departments to provide a single comprehensive point of contact throughout the review and permit process.

The permit system management helps to ensure that the customer’s needs are met efficiently and that the necessary permits and inspections are conducted on time. This is an essential part of the Division’s commitment to protecting Brea’s residents and visitors’ safety and well-being, preserving the city’s quality of life, and contributing to its economic growth.

 

City of Brea – Public Works Department:

The Public Works Department in Brea is dedicated to providing the community with high-quality maintenance and repair services.

The department comprises seven divisions, each responsible for a specific area of service:

The Administrative division oversees the overall operation of the department and manages the City’s seven Maintenance Districts.

The Building Maintenance division is responsible for maintaining City-owned buildings and facilities, including the Civic and Cultural Center, fire stations, the Community Center, and other public buildings.

The Engineering division prepares plans and specifications, solicits bids, and monitors construction work for City infrastructure projects.

The Equipment Maintenance division performs maintenance and repairs on all City vehicles and equipment to ensure they remain in good working condition.

The Parks and Landscape division is responsible for maintaining the City’s parks, medians, publicly-owned trees, and other landscaped areas, including city facility landscaping.

The Street division is responsible for maintaining the City’s streets, roadway signs, sidewalks, traffic signals, street lights, storm drains, and sewer system.

Finally, the Water division is responsible for maintaining the City’s water acquisition, distribution system, and quality control to ensure a reliable supply of safe drinking water for the community.

Each division is vital to the Public Works Department’s mission to provide top-notch maintenance and repair services while delivering excellent customer service. Through effective management of the City’s infrastructure, the Department helps ensure the community’s safety and well-being while contributing to the city’s overall quality of life.

 

General Area Summary: 

Brea is a city in Orange County, California, about 33 miles southeast of Los Angeles. The city has a population of approximately 49,000 people and is known for its vibrant downtown area with numerous shops, restaurants, and entertainment options. Brea is known for its excellent schools and family-friendly atmosphere, making it a popular destination for families and young professionals.